After Go-Live: Operations, Maintenance, Responsibility

Every project has a moment that feels like the finish line and isn't: go-live. Everyone is relieved, there is a brief celebration, and then the part begins that was discussed least beforehand.

"It is only finished when it runs" – and running does not mean "it worked once", it means "it still works in six months, when something changes and nobody thinks about the project anymore".

Why this part has become more important

The ratio used to be different. A project took nine months, operations were the time afterwards, and relative to the build time they barely registered economically.

Today implementation takes days. Operations still take years. That has inverted the ratio: most of an application's total cost now sits after go-live, not before it. Anyone drawing up an investment calculation without operations is not slightly off, they are fundamentally wrong.

It is also why I am sceptical when someone says they built their application over a weekend. It is probably true. The question is who operates it the weekend after next.

The decisions that have to be made in advance

Operations are not a phase that begins after implementation. The decisions that determine operations are made beforehand – and if you do not make them deliberately, you make them anyway, just at random.

Where does it run? Cloud or your own infrastructure, and in which region. For many Swiss SMEs that is not a matter of taste: customer data, HR data and financial data carry requirements you need to know before choosing an environment. Both paths are viable. The difference lies in what you want to do yourself and what you buy in.

Who has access? To the application, to the data, to the environment. It sounds like a formality; it is not. The most common real security incident in small companies is not an attack, but access somebody still has when they should not.

What happens during an outage? How long can the application be gone before it hurts, and how much data may be lost in the worst case. The backup concept follows from those two answers, not the other way round.

How do changes get in? There will be changes. If there is no path for them, you end up in the worst possible state: a system that is critical in production and that nobody dares to touch.

Who is responsible? A name, not a department. Responsibility spread across several people usually rests with nobody.

What maintenance actually means

Maintenance is not "fixing bugs". Fixing bugs is the smaller part. Maintenance mainly means:

Keeping dependencies current, because vulnerabilities appear in components you never touched yourself. Reacting to changes in connected systems that nobody announced. Watching data growth, because a report that was fast at a thousand records is no longer fast at a million. And documenting what changed, so that in a year's time somebody still understands why things are the way they are.

The effort is not dramatic if you plan for it. It is dramatic if you ignore it for two years and then have to catch up on everything at once.

Where AI helps – and where it does not

Staying honest: AI-assisted development helps a great deal with a large part of this work. Updating dependencies, adapting to changed interfaces, analysing performance problems, keeping documentation current – these are exactly the tasks that used to be left undone because they were unattractive and tied up capacity. Today they simply run alongside. That is one of the underrated advantages of the new model: maintenance actually gets done instead of postponed.

What AI does not take over is responsibility. The decision whether an update goes in now or after the quarterly close. The judgement whether an incident is reportable. The assurance to a client that their data sits where they believe it sits. These are not technical questions, and they cannot be automated away, because they do not consist of code but of decisions.

How we handle it

At Schoeberli, operations are part of the offering, not part of the small print. I do not hand over a system with the words "good luck with it". Either we operate it, or we set it up so that somebody else can take it on – documented, with clear access, with a path for changes.

That is less spectacular than an application built in days. But it is the difference between a project and a prototype.

If you are at that point right now

If something is running in your company that has become critical in production without anyone ever deciding who operates it: that is a very common state, and a good starting point for a conversation. Usually it does not take a rebuild, just clarity on four or five points.

Book a call.

In the next and final article in this series I take stock: what I learned in eight weeks of Schoeberli, including the points where I was wrong.